Wednesday, June 24, 2009

Septic tank and field drains all connected up


The field drain and the septic tank are now connected and sand has been put between the black cartridges.
There are also 4 cpvc turquoise pipes that come up from the 4 corners of the drain field for overflow. Seems as much overkill as the 800 cubic yards of sand that filled the hole.

No comments: