Inspector was supposed to show up between 11 am and noon but finally showed at 1:25pm. Rebar matched plans so gave his okay. Then, he threw in a curve about having a separate electric box on the outside of the ice house and thus adding a grounding strap to the rebar that comes up to meet the electric. The general contractor went off to Colucci's in Malaga to get bare wire and a special clamp for attaching it to the rebar.

My job is to watch for the concrete truck to pour the footings.