While I was on a road trip, the septic drain field and septic tank were ok'ed by the county inspector and then the gravel was used to cover them. There are still 5 plastic posts visible as these are the tank cleanout and the 4 vents for the septic field.
The contractor framed in the space for the toilet in the ice house and today the electrician is wiring everything.
No comments:
Post a Comment