The cork floor and the shower tile for the back bathroom have arrived. The bonus cabinet is because we had to use a smaller one on the east wall because the door opening to the kitchen moved north. So the south wall of the kitchen has more depth and the extra cabinet can go there. I will mount a microwave on a shelf above and put trash and recyle bins next to the extra cabinet without impinging on walkway space.
Tuesday, December 29, 2009
Subscribe to:
Post Comments (Atom)
1 comment:
Adventure quotes that inspire lifestyles of risk-taking.
wall cabinets
Post a Comment