Adventures in Newfield
Blog Archive
►
2020
(2)
►
November
(1)
►
February
(1)
►
2018
(1)
►
February
(1)
►
2017
(3)
►
July
(1)
►
March
(2)
►
2016
(1)
►
May
(1)
►
2015
(17)
►
October
(1)
►
September
(1)
►
June
(1)
►
April
(1)
►
March
(3)
►
February
(10)
►
2014
(6)
►
November
(2)
►
March
(2)
►
February
(2)
►
2013
(22)
►
October
(7)
►
September
(6)
►
July
(3)
►
May
(1)
►
April
(2)
►
March
(3)
►
2012
(8)
►
September
(3)
►
June
(1)
►
May
(1)
►
April
(1)
►
March
(1)
►
February
(1)
►
2011
(26)
►
September
(3)
►
August
(2)
►
May
(1)
►
April
(2)
►
March
(10)
►
February
(5)
►
January
(3)
►
2010
(88)
►
December
(2)
►
November
(1)
►
September
(2)
►
July
(1)
►
June
(6)
►
May
(11)
►
April
(13)
►
March
(15)
►
February
(17)
►
January
(20)
▼
2009
(122)
►
December
(21)
▼
November
(16)
leveling floor in old porch
no photos but have heat
2nd taping in progress
front walkway sealed while 1st taping coat dried
turkeys and sheet rock
construction adhesive, tacks, and screws hold up t...
drywall coming in on boom truck
door knobs and more electric
rest of insulation; lots of repurposing projects
from ordinary concrete to slate look alike
stamped concrete walkways taking shape
doors in; so is insulation
passed plumbing inspection ...
gas fireplace insert in place
found inexpensive spray paint gun that works
oil tank out of basement
►
October
(8)
►
September
(12)
►
August
(17)
►
July
(17)
►
June
(16)
►
May
(5)
►
April
(3)
►
March
(4)
►
February
(2)
►
January
(1)
►
2008
(11)
►
December
(1)
►
November
(3)
►
October
(2)
►
July
(5)
About Me
Maggie the Messmaker
View my complete profile
Monday, November 16, 2009
front walkway sealed while 1st taping coat dried
No more rain and decent temperature gave the wall board tape and mud time to dry. Also meant the front and side walkway could be scrubbed to get rid of remaining marks from person who walked on the powder and then covered with sealant.