

There are two sets of casements along the long north wall of the addition. The east wall which faces the ice house has a french door flanked by two casements. The south back side of the addition has two sets of windows also.



Front doorway was widened for 36 rather than 32" door. Framing for the first of three coffers has been started. Beam was added underneath ice house floor so it now connects to concrete block pillar. And the framing for the gas fireplace was completed. The issue for that was the size of the double sided firebox and enough interior space in the chase (column going up) to contain the flue.